1.3.1 At any
time when an ACV is undergoing alterations or damage repairs, any
exposed parts of the structure normally difficult to access are to
be specially examined, e.g. if any part of the main or auxiliary machinery
is removed for any reasons, the hull structure in way is to be carefully
examined by the Surveyor.
1.3.3 Trials
are to be made on any craft which have been significantly modified,
overhauled or repaired, prior to returning to service, to ensure to
the Surveyor's satisfaction that the ACV has been returned in a satisfactory
condition for its intended service.