3.1.1 Following
satisfactory review of the plans and other information submitted,
an ENV Initial Survey is to be undertaken for ships under construction
or in service.
3.1.2 At the
ENV Initial Survey, the Surveyor is to be satisfied that the requirements
of these Rules are complied with. The Surveyor is to verify that the
hull and machinery arrangements are in accordance with the approved
documentation. The installed equipment, together with associated control
and alarm systems, is to be demonstrated under working conditions.
3.1.3 Following
the successful completion of the Initial Survey, the ENV notation
may be assigned to a ship. The ENV notation will be valid,
in the first instance, for a period not exceeding 12 months. During
this period, an audit of the procedures as required by these Rules
is to be undertaken. This audit is to be performed after the procedures
have been fully implemented, subjected to internal audit and have
generated at least 3 months of records under in-service conditions.
3.1.4 Audits
are to confirm by direct observation, examination of internal audit
reports and scrutiny of records that each of the procedures have been
implemented effectively over the preceding period. It is also to be
verified that:
-
the required resources
and equipment have been provided; and
-
the ship's staff
are aware of their duties and responsibilities, and can perform the
assigned tasks.