                     Section 
                     5 Additional requirements for Part 2 of the Scheme
                  
                     
                        
                          5.1 Quality System procedures
                         
                     
                        
                          5.2 Quality Plans
                        
                           
                           
                              
                              
                              5.2.1 Quality
                                 Plans for ships which are to be classed by LR are to be submitted
                                 for approval well in advance of commencement of work, irrespective
                                 of any submissions that may have been made for sister ships under
                                 Part 1 of the Scheme. Such Quality Plans are to outline all of the
                                 manufacturing, testing and inspection operations to be performed by
                                 the Shipbuilder and by which personnel they will be carried out. The
                                 Quality Plans are then to be submitted to the LR Surveyors who will
                                 indicate all the stages at which they will perform system monitoring,
                                 carry out direct inspection and participate in hold point inspections.
                                 These hold points will include, but not be limited to, the following:
                               
                                 
                                    
                                    
                                    Radiographs and
                                       other test records of non-destructive examinations as required for
                                       Classification purposes, see 
                                       Ch  13,  2.12 Non-destructive examination of steel welds of the Rules for Materials.
                                       
                                    
                                    
                                    
                                    The items described
                                       in Pt  3, Ch  1,  8 Inspection and workmanship relevant to the scope
                                       of this Chapter.
                                       
                                     
                              
                              
                              5.2.2 Notwithstanding
                                 what may have been agreed in the Quality Plans, the LR Surveyors have
                                 the discretion to increase their involvement, see also 
                                 Pt  3, Ch  15,  8.1 General 8.1.5.
                                 
                               
                     
                        
                          5.3 Material supplier approval
                        
                           
                           
                              
                              
                              5.3.1 	The
                                 Shipbuilder is to ensure that hull construction materials and consumables
                                 used are selected from manufacturers who are approved by LR.
                               
                     
                        
                          5.4 Identification and traceability
                         
                     
                        
                          5.5 Fabrication control
                        
                           
                           
                           
                           
                           
                              
                              
                              5.5.2 Procedures
                                 for material treatment, forming, weld preparation and welding are
                                 to be submitted for approval.
                               
                     
                        
                          5.6 Control of inspection and testing
                        
                           
                           
                              
                              
                              5.6.1 The
                                 inspection stages incorporated into the Scheme are to include specific
                                 checks for fit-up and welding which are to be carried out at each
                                 sub-assembly, assembly, pre-erection and erection stage as well as
                                 self-checking by the operator. The number of recorded checks to each
                                 stage will be agreed with the LR Surveyor, after consideration of
                                 documentary evidence of quality being achieved. Repairs, where required,
                                 are to be effected after each check. Collated Quality Control data
                                 to demonstrate the efficiency of the above self-check system are to
                                 be made available to the LR Surveyor by the Shipbuilder. The Quality
                                 Plans referred to in Pt  3, Ch  15,  4.7 The Quality Management System 4.7.3.(b) provide
                                 the opportunity for the Shipbuilder and the LR Surveyor to consider
                                 the structural design and ship type fully in order to determine the
                                 most efficient and effective inspection stages.
                                 
                               
                     
                        
                          5.7 Control of non-conforming materials and corrective action
                        
                           
                           
                              
                              
                              5.7.1 All
                                 predetermined repair procedures are to be consistent with the requirements
                                 of Pt  3, Ch  15,  4.7 The Quality Management System 4.7.3 and are to
                                 be to the satisfaction of the LR Surveyor. Where a defect is found,
                                 whether by the LR Surveyor or through shipyard inspection, for which
                                 no agreed repair procedure exists, approval is to be obtained from
                                 the LR Surveyor before any corrective action is effected.
                                 
                               
                     
                        
                          5.8 Records
                         
                     
                        
                          5.9 Training
                        
                           
                           
                              
                              
                              5.9.1 The
                                 competence of the welding operators, non-destructive examination and
                                 other personnel involved in special processes and inspection are to
                                 be to the satisfaction of the LR Surveyor.
                               
                     
                        
                          5.10 Sub-contracted personnel, services and components
                        
                           
                           
                              
                              
                              5.10.1 The
                                 requirements of the Scheme are not applicable to those services operating
                                 at locations outside the shipyard. It will be necessary for inspections
                                 to be carried out by the LR Surveyor using conventional survey methods.
                               | 
         
            | 
                  
                  
                  
                  
                     
                        | Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
                           and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
                           officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
                           Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
                           on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
                           Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
                           exclusively on the terms and conditions set out in that contract. |  |  |