2 Information to be submitted
2.1 General
2.1.1 Before
work is commenced, plans in triplicate of the information listed in Pt 4, Ch 1, 2.2 Control and safety systems, Pt 4, Ch 1, 2.3 Electrical systems, Pt 4, Ch 1, 2.4 Piping systems, Pt 4, Ch 1, 2.5 Pressure vessels are to be submitted to LR
for approval.
2.2 Control and safety systems
2.2.1 Details
of the following control systems and safeguards:
-
Description
of operation with explanatory diagrams as appropriate.
-
Schematic
diagrams of control circuits.
-
Environmental
specification of items of control and safety equipment.
-
Test schedules,
including methods of test and required test results.
2.2.2 Items
of equipment under control including:
-
Air compressors
used in ballasting.
-
Bilge and
ballast pumps.
-
Hydraulic
pumps and motors for positioning.
-
Electrical
motors for positioning.
-
Auxiliary
engines and ancillary systems.
-
Winches.
-
Hydraulic
actuators.
-
Remotely or
automatically controlled doors, gates or lifting equipment.
-
Other automatic
or remote means of positioning.
2.3 Electrical systems
2.3.1 Single
line diagram of power and lighting systems which is to include:
-
ratings of
machines, transformers, batteries and semi-conductor converters,
-
all feeders
connected to the switchboards,
-
section boards
and distribution boards,
-
insulation
type, size and current loadings of cables,
-
make, type
and rating of circuit breakers and fuses.
2.3.2 Simplified
diagrams of generator circuits, if fitted, interconnector circuits
and feeder circuits showing:
-
protective
devices, e.g. short circuit, overload, reverse power protection,
-
instrumentation
and synchronizing devices,
-
preference
tripping,
-
remote stops,
-
earth fault
indication/protection.
2.3.3 Calculations
of short circuit currents at switchboards and section boards including
those fed from transformers, details of circuit breaker and fuse operating
times and discrimination curves.
2.3.4 Schedule
of normal and emergency loads on the system estimated for the different
conditions expected.
2.4 Piping systems
2.4.1 Venting,
sounding and drainage arrangements for all spaces.
2.4.2 The
following diagrammatic plans including details of the material and
pipe dimensions/thickness:
-
Bilge and
ballast system including the capacities of the pumps on bilge service.
-
Hydraulic
oil and other flammable liquid systems.
-
Compressed
air systems.
-
Any other
system installed which is necessary for the operation of the facility.
2.4.3 Where it is intended to use plastic pipes for Class I, Class II and any
Class III systems for which there are requirements in these Rules, details of the
following:
-
Properties
of the materials.
-
Operating
conditions.
-
Intended service
and location.
-
Pipes, fittings
and joints.
2.4.4 Design
details of the following components:
-
Flexible hoses.
-
Sounding devices.
-
Resiliently
seated valves.
-
Expansion
joints.
2.5 Pressure vessels
2.5.2 Plans
of full constructional features of the vessel and dimensional details
of the weld preparations for longitudinal and circumferential seams
and attachments, together with particulars of the welding consumables
and of the mechanical properties of the materials, are to be submitted
before construction is commenced.
|
Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
exclusively on the terms and conditions set out in that contract.
|
 |
|