Section 
                     11 Screwshafts, tube shafts, propellers and water jet units
                  
                  
                  
                  
                  
                  
                  
                     
                        
                         
                        11.1 Definitions
                        
                        
                        
                        
                           
                           
                              
                              
                              11.1.1 Adequate means for protection against corrosion. An adequate means for
                                 protection against corrosion is an approved means for full protection of the shaft against
                                 sea water intrusion and subsequent corrosion attack. Such means are used for the protection
                                 of common steel material against corrosion particularly in combination with water lubricated
                                 bearings. Typical means are to be for example: 
                                  
                                    - continuous metallic, corrosion-resistant liners (Pt  11, Ch  2,  4.14 Corrosion resistant liners on shafts) 
                                    
 
                                    - continuous cladding,
 
                                    - multiple layer synthetic coating, 
 
                                    - multiple layers of fiberglass, 
 
                                    - combinations of above mentioned, 
 
                                    - rubber/elastomer covering coating.
 
                                  
                                 
                                 
                               
                              
                              
                              
                              The means for protection against corrosion are to be installed/applied
                                 according to LR approved procedures.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.2 Fresh Water sample test. At the Screwshaft Survey, a sample of the
                                 fresh water in a closed loop fresh water lubricated shaft is to be taken in the presence of
                                 a Surveyor. Fresh Water sample tests are to be carried out at regular intervals not
                                 exceeding six months. The samples are be taken under service conditions and are to be
                                 representative of the water circulating within the sterntube. The Fresh Water sample test
                                 shall include measurement of chloride and sodium content, pH value and the presence of
                                 particles from both metallic and synthetic materials. Analysis results are to be retained on
                                 board. 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.3 Lubricating oil analysis. Lubricating oil analysis is to be carried out at regular
                                 intervals not exceeding six months. The documentation on lubricating oil analysis is to be
                                 available on board. Oil samples, to be submitted for the analysis, should be taken under
                                 service conditions.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.4 Oil sample examination. An oil sample examination is a visual
                                 examination of the sterntube lubricating oil taken in the presence of a Surveyor, with a
                                 focus on water contamination. 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.5 Service records. Service records are regularly recorded data showing in-service
                                 conditions of the shaft(s) and are to include: 
                                  
                                    - For Oil Lubricated Stern Bearings: lubricating oil temperature, bearing temperature
                                       and oil consumption records.
                                    
 
                                    - For Closed Loop System Fresh Water Lubricated Bearings: water flow, water temperature,
                                       salinity, pH, make-up water and water pressure (depending on design).
                                    
 
                                  
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.6 Survey Methods on Closed Systems. Oil Lubricated Shafts or Closed Loop System Fresh
                                 Water Lubricated Shafts: 
                                  
                                    - TS Method 1 – Survey of screwshaft, tube shaft and propeller in
                                       accordance with the requirements of TS Method 1, see
                                       Table 3.11.3 Shaft survey methods. Primarily
                                       the shaft is withdrawn and the propeller is removed. 
                                    
 
                                    - TS Method 2 – Survey of screwshaft, tube shaft and propeller in
                                       accordance with the requirements of TS Method 2, see
                                       Table 3.11.3 Shaft survey methods Shaft
                                       survey methods. Primarily records are reviewed, the propeller is removed but the shaft
                                       is not withdrawn.
                                    
 
                                    - TS Method 3 – Survey of screwshaft, tube shaft and propeller in
                                       accordance with the requirements of TS Method 3, see
                                       Table 3.11.3 Shaft survey methods. Primarily
                                       records are reviewed, the shaft is not withdrawn and the propeller is not removed.
                                    
 
                                  
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.7 Survey Methods on Open Systems. Water Lubricated Shafts: 
                                  
                                    - TS Method 4 – Survey of screwshaft, tubeshaft and propeller in
                                       accordance with the requirements of TS Method 4, see
                                       Table 3.11.3 Shaft survey methods. Primarily the shaft is withdrawn and
                                       the propeller is removed.
                                    
 
                                  
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.1.8 Tube shaft is a shaft placed between the intermediate shaft and
                                 propeller shaft, normally arranged within a sterntube or running in open water. It may also
                                 be called a Sterntube Shaft.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.2 Closed Systems – Oil lubricated shafts or
                           closed loop system fresh water lubricated shafts: Frequency of surveys
                        
                        
                        
                        
                           
                           
                           
                           
                           
                              
                              
                              11.2.2 Shafts with a keyless propeller connection or a flanged propeller connection
                                 (including controllable pitch propellers for main propulsion purposes) are to be
                                 surveyed at intervals of five years in accordance with TS Method 1, 2 or 3.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.2.3 Shafts with a keyed propeller connection with a keyway that complies fully with the
                                 present Rules are to be surveyed at intervals of five years in accordance with TS
                                 Method 1 or 2; TS Method 3 is not permitted.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.2.4 For oil lubricated keyless shafts, the maximum interval between two surveys carried
                                 out according to TS Method 1 or TS Method 2 shall not exceed 15 years, except in the
                                 case when one extension for no more than three months is agreed.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.2.5 For closed loop system fresh water lubricated shafts, the maximum
                                 interval between two surveys carried out according to TS Method 1 shall not exceed
                                 15 years, except in the case when one extension for no more than three months is
                                 agreed. 
                               
                              
                              
                            
                           
                           
                           
                           
                           
                           
                              
                              
                              11.2.7 TS Method 2 and TS Method 3 are only permitted where the prerequisite service records
                                 and data specified for those methods are to be provided. If at the time of survey
                                 the attending Surveyor is not satisfied with the service records and data presented,
                                 then the shaft may be required to be withdrawn. The service records and data are to
                                 be retained on board and audited by LR at the Annual Survey.
                               
                              
                              
                            
                           
                           
                           
                           
                           
                           
                              
                              
                              11.2.9 For oil lubricated arrangements, the descriptive note ShipRight SCM is not a
                                 prerequisite in order to hold TS Method 2 and TS Method 3.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.2.10 In order to assign and maintain the descriptive note ShipRight SCM, the
                                 requirements of Pt  11, Ch  2,  5.2 Screwshaft Condition Monitoring (SCM) and
                                 ShipRight Procedure Machinery Planned Maintenance and Condition Monitoring,
                                    Section 6 are to be complied with, including the requirements therein for
                                 onboard maintenance of records and review of them by the attending Surveyor at
                                 Annual Survey.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.2.11 For surveys completed within three months before the shaft survey due date, the next
                                 period will start from the shaft survey due date.
                               
                              
                              
                            
                           
                           
                           
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.3 Open systems – Water lubricated shafts:
                           Frequency of surveys
                        
                        
                        
                        
                           
                           
                              
                              
                              11.3.1 Survey in accordance with TS Method 4 at intervals of five years is
                                 applicable to any of the following: 
                                  
                                    - Single shaft operating in fresh water only; 
 
                                    - Single shaft provided with approved adequate means of protection against
                                       corrosion or fabricated from corrosion-resistant material; 
                                    
 
                                    - Multiple shaft arrangements.
 
                                  
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.2 Single shaft configurations other than listed above are to be surveyed
                                 every three years in accordance with TS Method 4. 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.3 For shafts subject to five-yearly surveys with keyless connections, at
                                 the Surveyor’s discretion removal of the propeller and NDE of the shaft taper, as
                                 required by TS Method 4, need only be carried out every 15 years, subject to a
                                 satisfactory visual inspection of all accessible parts of the shafting system at the
                                 intervening surveys.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.4 For surveys completed within three months before the shaft survey due
                                 date, the next survey period will start from the shaft survey due date.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.5 For shafts with a keyless propeller connection or a flanged propeller connection
                                 (including controllable pitch propellers for main propulsion purposes), and when the
                                 descriptive note ShipRightSCM is assigned to an open loop water lubricated
                                 shaft, a TS Method 4 survey may be replaced by a TS Method 2 or TS Method 3 survey.
                                 Notwithstanding this, the maximum interval between two surveys carried out according
                                 to TS Method 2 or TS Method 4 shall not exceed 15 years, except in the case when one
                                 extension for no more than three months is agreed.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.6 For shafts with a keyed propeller connection, and when the descriptive note
                                 ShipRightSCM is assigned to an open loop water lubricated shaft, a TS
                                 Method 4 survey may be replaced by a TS Method 2 survey.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.3.7 At the discretion of the Classification Committee, consideration may be
                                 given to accept special arrangements to monitor the condition of the screwshaft,
                                 bearings, sealing devices and the sterntube lubricant system so as to allow an
                                 extension to the interval between withdrawals of the Screwshaft required by TS
                                 Method 4. This is subject to the shaft being provided with approved adequate means
                                 of protection against corrosion or being fabricated from corrosion-resistant
                                 material.
                               
                              
                              
                            
                           
                           
                           
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.4 Survey extensions
                        
                        
                        
                        
                           
                           
                              
                              
                              11.4.1 For all types of propeller connections, consideration can be given at the
                                 discretion of the Classification Committee to an extension of the interval between
                                 two consecutive surveys after the execution of an extension survey as follows:
                                  
                                    -  Extension up to a maximum of two and a half years: Only permitted for
                                       closed systems. No more than one extension can be considered. No further
                                       extension, of other type, can be considered.
                                    
 
                                    - Extension up to a maximum of one year: Two consecutive ‘one year extensions’
                                       can be considered. Where an additional extension is agreed the requirements
                                       of the ‘two and a half year extension’ are to be carried out and the shaft
                                       survey due date, prior to the previous extension(s), is extended for a
                                       maximum of two and a half years.
                                    
 
                                    -  Extension up to a maximum of three months: One ‘three month extension’ can
                                       be considered. In the event an additional extension is agreed the
                                       requirements of the ‘one year extension’ or ‘two and a half years extension’
                                       are to be carried out and the shaft survey due date, prior to the previous
                                       extension, is extended for a maximum of one year or two and a half
                                       years.
                                    
 
                                  
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.4.2 If the extension survey is carried out within one month of the shaft survey due date
                                 then the extension will take effect from the shaft survey due date.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.4.3 If the extension survey is carried out more than one month prior to the shaft survey
                                 due date, then the period of extension will take effect from the date on which the
                                 extension survey was completed.
                               
                              
                              
                              
                              
                                 Table 3.11.1 Summary of survey intervals
                                       and extensions – Closed systems
                                 
                                    
                                       
                                          | Oil Lubricated
                                             
                                           | 
                                        
                                       
                                          |  
                                             
                                           | 
                                          Flanged Propeller
                                             Coupling
                                             
                                           | 
                                          Keyless Propeller
                                             Coupling
                                             
                                           | 
                                          Keyed Propeller
                                             Coupling
                                             
                                               (see Note b)
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | Every 5 years
                                             
                                              (see Note a)
                                              
                                             
                                             
                                           | 
                                          TS Method 1 or
                                             
                                              TS Method 2 or 
                                             
                                             
                                             TS Method
                                                3
                                              
                                             
                                             
                                           | 
                                          TS Method 1 or
                                             
                                              TS Method 2 or 
                                             
                                             
                                             TS Method 3  
                                             
                                             
                                             (see Note c)
                                              
                                             
                                             
                                           | 
                                          TS Method 1 or
                                             
                                              TS Method 2 
                                             
                                             
                                           | 
                                        
                                       
                                          | Extension 2,5
                                             years
                                             
                                           | 
                                          Yes (see
                                                Note d)
                                             
                                           | 
                                          Yes (see
                                                Note d)
                                             
                                           | 
                                          Yes (see
                                                Note d)
                                             
                                           | 
                                        
                                       
                                          | Extension 1
                                             year
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                        
                                       
                                          | Extension 3
                                             months
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                        
                                       
                                          |  
                                             
                                           | 
                                        
                                       
                                          | Closed Loop System Fresh Water Lubricated
                                             
                                           | 
                                        
                                       
                                          |  
                                             
                                           | 
                                          Flanged Propeller
                                             Coupling
                                             
                                           | 
                                          Keyless Propeller
                                             Coupling
                                             
                                           | 
                                          
                                             
                                             
                                              Keyed Propeller Coupling  
                                             
                                             
                                             
                                             (see Note b)
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | Every 5 years 
                                             
                                              (see Note a)
                                              
                                             
                                             
                                           | 
                                          TS Method 1
                                             
                                               (see Note g)  or
                                              
                                             
                                             
                                             TS Method
                                                2 (see  Note g) or
                                              
                                             
                                             
                                             TS Method
                                                3
                                              
                                             
                                             
                                           | 
                                          TS Method 1
                                             
                                               (see Note g)  or
                                              
                                             
                                             
                                             TS
                                                Method 2 (see  Note g) or
                                              
                                             
                                             
                                             TS Method
                                                3
                                              
                                             
                                             
                                           | 
                                          TS Method 1 
                                             
                                              (see Note g)  or
                                              
                                             
                                             
                                             TS Method
                                                2 (see  Note g)
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | Extension 2,5
                                             years
                                             
                                           | 
                                          Yes (see
                                             Note d)
                                             
                                           | 
                                          Yes (see
                                                Note d)
                                             
                                           | 
                                          Yes (see
                                                Note d)
                                             
                                           | 
                                        
                                       
                                          | Extension 1
                                             year
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                          Yes (see
                                                Note e)
                                             
                                           | 
                                        
                                       
                                          | Extension 3
                                             months
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                          Yes (see
                                                Note f)
                                             
                                           | 
                                        
                                       
                                          |  
                                             
                                           | 
                                        
                                       
                                          | General notes:
                                             
                                              For surveys (TS Method 1,
                                                or TS Method 2, or TS Method 3) completed within 3 months before
                                                the shaft survey due date, the next period will start from the
                                                shaft survey due date.
                                              
                                             
                                             
                                             If the extension
                                                survey is carried out within 1 month of the shaft survey due
                                                date then the extension will take effect from the shaft survey
                                                due date. If the extension survey is carried out more than 1
                                                month prior to the shaft survey due date, then the period of
                                                extension counts from the date when the extension survey was
                                                completed.
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | Notes:
                                              Note a. Unless an
                                                extension (Extension 2,5 years, Extension 1 year, Extension 3
                                                months) is applied in between. 
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note b. TS Method 3
                                                not allowed.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note c. The maximum
                                                interval between two surveys carried out according to TS Method
                                                1 or TS Method 2 shall not exceed 15 years, except in the case
                                                when one extension for no more than 3 months is agreed.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note d. No more than
                                                one extension can be considered. No further extension of other
                                                type can be considered.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note e. Two
                                                consecutive extensions can be considered. Where an additional
                                                extension is agreed the requirements of the ‘2,5 year extension’
                                                are to be carried out and the shaft survey due date, prior to
                                                the previous extension(s), is extended for a maximum of 2,5
                                                years.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note f. Extension up
                                                to a maximum of 3 months: One ‘3 month extension’ can be
                                                considered. In the event an additional extension is agreed the
                                                requirements of the ‘1 year extension’ or ‘2,5 years extension’
                                                are to be carried out and the shaft survey due date, prior to
                                                the previous extension, is extended for a maximum of 1 year or
                                                2,5 years.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note g. The maximum
                                                interval between two surveys carried out according to TS Method
                                                1 (or TS Method 2 for arrangements where ShipRightSCM was
                                                assigned) shall not be more than 15 years, except in the case
                                                when one extension for no more than 3 months is agreed.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                    
                                  
                                 
                               
                              
                              
                              
                              
                                 Table 3.11.2 Summary of survey intervals
                                       and extensions – Open systems
                                 
                                    
                                       
                                          
                                             
                                             
                                                - Single shaft operating exclusively in fresh
                                                   water.
                                                
 
                                                - Single shaft provided with adequate means of
                                                   corrosion protection, single corrosion-resistant shaft.
                                                
 
                                                - All kinds of multiple shaft arrangements.
 
                                              
                                             
                                             
                                             
                                           | 
                                          Other shaft configuration.
                                             
                                           | 
                                        
                                       
                                          |  
                                             
                                           | 
                                          All kinds of propeller
                                             coupling
                                             
                                              (see Note d)
                                              
                                             
                                             
                                           | 
                                           
                                             
                                           | 
                                          All kinds of propeller
                                             coupling
                                             
                                              (see Note d)
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | Every 5 years (see Note
                                             a)
                                             
                                           | 
                                          TS Method 4 (see Note
                                             e)
                                             
                                           | 
                                          Every 3 years (see Note
                                             a)
                                             
                                           | 
                                          TS Method 4
                                             
                                           | 
                                        
                                       
                                          | Extension 1 year
                                             
                                           | 
                                          Yes (see Note b)
                                             
                                           | 
                                          Extension 1 year
                                             
                                           | 
                                          Yes (see Note
                                             b)
                                             
                                           | 
                                        
                                       
                                          | Extension 3 months
                                             
                                           | 
                                          Yes (see Note
                                             c)
                                             
                                           | 
                                          Extension 3 months
                                             
                                           | 
                                          Yes (see Note c)
                                             
                                           | 
                                        
                                       
                                          | General notes:
                                             
                                              For surveys (TS Method 4) completed
                                                within 3 months before the shaft survey due date, the next
                                                period will start from the shaft survey due date.
                                              
                                             
                                             
                                             If the extension survey is carried out within 1
                                                month of the shaft survey due date then the extension will take
                                                effect from the shaft survey due date. If the extension survey
                                                is carried out more than 1 month prior to the shaft survey due
                                                date, then the period of extension counts from the date when the
                                                extension survey was completed.
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | Notes:
                                              Note a.
                                                Unless an extension (Extension 1 year, Extension 3 months) is
                                                applied in between.
                                              
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note b. No more than
                                                one extension can be considered. No further extension, of other
                                                type, can be considered.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note c. One
                                                extension can be considered. In the event an additional
                                                extension is agreed the requirements of the one year extension
                                                are to be carried out and the shaft survey due date prior to the
                                                previous extension is extended for a maximum of one year.
                                              
                                             
                                             
                                             
                                           | 
                                        
                                       
                                          | 
                                             
                                              Note d. For keyless
                                                propeller connections the maximum interval between two
                                                consecutive dismantling and verifications of the shaft cone by
                                                means of non-destructive examination (NDE) shall not exceed 15
                                                years.
                                              
                                             
                                             
                                             Note e. Unless descriptive note ShipRightSCM is assigned. 
                                              
                                             
                                             
                                             
                                           | 
                                        
                                    
                                  
                                 
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.5 Shaft survey methods
                        
                        
                        
                        
                           
                           
                              
                              
                              11.5.1 For the survey methods see
                                 Table 3.11.3 Shaft survey methods
                                 below.
                               
                              
                              
                              
                              
                                 Table 3.11.3 Shaft survey methods
                                 
                                    
                                       
                                          |  
                                             
                                           | 
                                          TS
                                              METHOD 1 
                                             
                                             
                                           | 
                                          TS
                                              METHOD 2 
                                             
                                             
                                           | 
                                          TS
                                              METHOD 3 
                                             
                                             
                                           | 
                                          TS
                                              METHOD 4 
                                             
                                             
                                           | 
                                        
                                       
                                          | GENERAL
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Drawing the shaft and examining the entire
                                             shaft (including liners, corrosion protection system and stress
                                             reducing features, where provided), sealing system and
                                             bearings
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | SHAFT
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Visual examination of all accessible parts
                                             of the shafting system in situ
                                              | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | For keyed and keyless propeller
                                             connections, removing the propeller to expose the forward end of the
                                             taper 
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | For keyed and keyless propeller
                                             connections, perform a non-destructive examination (NDE) by an
                                             approved surface crack-detection method around the after end of the
                                             cylindrical part of the shaft and the forward one-third of the shaft
                                             cone, including the keyway with the key removed (if fitted); for
                                             shafts provided with liners the NDE shall be extended to the after
                                             edge of the liner
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | For flanged connections, whenever the
                                             coupling bolts of any type of flange-connected shaft are removed or
                                             the flange radius is made accessible in connection with overhaul,
                                             repairs or when deemed necessary by the Surveyor, the coupling bolts
                                             and flange radius are to be examined by means of an approved surface
                                             crack detection method
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | Visual examination of all accessible parts
                                             of the shafting system following re-installation of the
                                             shaft
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | PROPELLER
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Visual examination of the
                                             propeller. Examination of the edges and roots of the propeller’s
                                             blades by an approved surface crack detection method, if deemed
                                             necessary by the Surveyor
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | Controllable pitch propellers, where
                                             fitted, are to be opened up and the working parts examined, together
                                             with the control gear. Propeller to be examined upon
                                             reassembly
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | Operational test of pitch
                                             functionality to its full range, including visual confirmation of no
                                             leakage in the CPP seals
                                             
                                           | 
                                          
                                             X
                                             
                                           | 
                                          X 
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X 
                                             
                                           | 
                                        
                                       
                                          | Examination of the propeller following
                                             re-installation
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | BEARING CLEARANCES
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Checking, recording and verification of
                                             bearing clearances
                                             
                                           | 
                                           X
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           X
                                             
                                           | 
                                        
                                       
                                          | Recording the bearing weardown measurements
                                             after re-installation, if applicable 
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Checking and recording the bearing weardown
                                             measurements
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | SEALING SYSTEM
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Examine the inboard and outboard seals with
                                             shaft removed and following the re-installation of the shaft and
                                             propeller
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | Examine the inboard and outboard
                                             seals
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Examination of seal liner 
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | OTHERS
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Stationary supporting structure and any
                                             erosion protection inserts or doublers are to be examined in way of
                                             any propulsion devices
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | Verification of no unapproved repairs by
                                             grinding or welding of shaft and/or propeller
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                        
                                       
                                          | SERVICE RECORDS
                                              | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Review of service records
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Review of test records of Lubricating Oil
                                             Analysis (for oil lubricated shafts), or Fresh Water Sample Test
                                             (for closed system fresh water lubricated shafts)
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                       
                                          | Oil Sample Examination (for oil lubricated
                                             shafts), or Fresh Water Sample Test (for closed system fresh water
                                             lubricated).
                                             
                                           | 
                                           
                                             
                                           | 
                                          X
                                             
                                           | 
                                          X
                                             
                                           | 
                                           
                                             
                                           | 
                                        
                                    
                                  
                                 
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.6 Other systems
                        
                        
                        
                        
                           
                           
                              
                              
                              11.6.1 Directional propeller and podded propulsion units for main propulsion
                                 purposes, inclusive of the propellers, shafts, gearing, control gear and the primary
                                 electrical components including any control and protection devices, are to be
                                 surveyed at intervals not exceeding five years. They are to be dismantled if
                                 considered necessary and generally examined as far as practicable. Non-destructive
                                 examination is to be carried out as considered necessary by the Surveyor on
                                 blade/fin roots. Consideration may be given to condition monitoring schemes for
                                 determining the condition of the unit. 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.6.2 Dynamic positioning and/or thruster-assisted mooring and athwartship
                                 thrust propellers and shaftings are to be surveyed at intervals not exceeding five
                                 years. They are to be generally examined so far as possible in dry dock and tested
                                 under working conditions afloat for satisfactory operation. All accessible parts,
                                 including sealing, locking and bearing faces, and any other moving parts are to be
                                 examined. Non-destructive examination is to be carried out as considered necessary
                                 by the Surveyor on blade/fin roots. Consideration may be given to condition
                                 monitoring schemes for determining the condition of the unit. 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.6.3 Water jet units for main propulsion purposes, including the impeller,
                                 casing, shaft, shaft seal, shaft bearing, inlet and outlet channels, steering
                                 nozzle, reversing arrangements, and control gear are to be surveyed at intervals not
                                 exceeding five years, provided the impeller shafts are made of approved
                                 corrosion-resistant material or have approved equivalent arrangements. They are to
                                 be generally examined so far as practicable.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              11.6.4 Stationary supporting structure and any erosion protection inserts or
                                 doublers are to be examined in way of any propulsion devices.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        11.7 Alternative arrangements
                        
                        
                        
                        
                           
                           
                              
                              
                              11.7.1 The Classification Committee will be prepared to give consideration to
                                 the circumstances of any special case upon application by the Owner, where the level
                                 of safety achieved is equivalent to that obtained by the survey methods described in
                                 this Section.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                
             |