13.2.1 The installation plan should include approved/reviewed drawings, equipment
certificates (if necessary), cable penetration certificates and any other
certification requested by the Flag State Administration.
13.2.2 When necessary, procedures for demonstrating adequate structural integrity to
modified tanks and watertight boundaries should be presented and the testing
witnessed.
13.2.3 A speed trial for the EEDI should be attended by the Flag State
Administration. The trial will need to be conducted in accordance with the agreed
speed trial plan. It should be noted that any discrepancies such as missing or
erroneous data, or misconduct, such as course drift or course rotation may
invalidate the results of the speed trial.