The loading in the foremost cargo hold is not to exceed
the allowable hold loading in the flooded condition, calculated as
per section 4, using the
loads given in section 2 and
the shear capacity of the double bottom given in section 3.
In no case is the allowable hold loading in the flooding condition
to be taken greater than the design hold loading in the intact condition.