Table of contents
|
1
|
General
|
2
|
Method of checking proper closure of release hooks
|
3
|
Launching operation
|
|
3.1
|
Preparation
before launching
|
|
3.2
|
Setting painter
|
|
3.3
|
Release of
safety pin for winch hand brake lever
|
|
3.4
|
Release of
davit arm stop
|
|
3.5
|
Boarding the
lifeboat
|
|
3.6
|
Launching procedure
|
|
3.7
|
Release gear
operation
|
|
3.8
|
Painter release
and lifeboat operation
|
|
Recovery operation
|
|
4.1
|
Resetting procedure
of release hook
|
|
4.2
|
Recovery procedure
|
|
4.3
|
Stowage procedure
|
5
|
On-load/off-load release gear system
|
|
5.1
|
General
|
|
5.2
|
Fore and aft
hook units
|
|
5.3
|
Release handle
unit
|
|
5.4
|
Hydrostatic interlock unit
|
6
|
Inspection and
maintenance
|
|
6.1
|
General precautions
|
|
6.2
|
Inspection and maintenance of lifeboat
and release gear system
|
|
6.3
|
Inspection and maintenance of launching
appliances (davits and winches)
|