No.
|
Operation Guide
|
Schematic Diagram
|
1
|
Manoeuvre the
lifeboat to come under boat falls.
|
|
2
|
Adjust the heights
of the suspension links by raising or lowering the boat
falls.
<Activity on the ship> and
<Activity in the lifeboat>
under good communication
|
|
3
|
Insert the
safety pin of the boat winch
handbrake.
<Activity on the ship>
|
|
4
|
Connect the
suspension links of the davit simultaneously to both, fore and aft
hooks.
<Activity in the
lifeboat>
|
|
5
|
Hoist the lifeboat
just clear of the water and stop hoisting.
<Activity on the ship> and
<Activity in the lifeboat>
|
|
6
|
Confirm that the
hydrostatic interlock lever has moved to the “locked” position
for the lifeboat not being
waterborne.
<Activity in the
lifeboat>
|
|
7
|
Where
the resetting is incomplete, return to the first step.
|