| Location
|
Inspectable/repairable?
|
Substantial consequence of failure?
|
Fatigue life factor
|
| Bilge keel in
way of ballast tanks or void spaces
|
Wet
(OIWS)
|
No
(no pollution)
|
2
|
| Bilge
keel
|
Wet
(OIWS)
|
Yes
(pollution)
|
4
|
| LNG pump tower
attachment points (top dome penetrations and bottom base support
penetrations)
|
No
(covered by insulation)
|
Yes
(loss of primary and secondary barriers)
|
10
|
| LNG pump
tower
|
Dry
|
Yes
(loss of primary and secondary barriers)
|
2
|
| Bottom
longitudinal stiffener end connections inway of ballast tanks or
void spaces
|
Dry
|
No
(no pollution)
|
1
|
| Bottom
longitudinal stiffener end connections
|
Dry
|
Yes
(pollution)
|
2
|
| Double hull
hopper knuckle connection
|
Dry
|
No
(no pollution)
|
1
|
| Stiffened
plate module supports attachment to upper deck
|
Dry
|
No
|
1
|
| Lattice module
supports attachment to upper deck
|
Dry
|
Yes
|
2
|
| Lattice module
supports attachment to upper deckwith single member
redundancy
|
Dry
|
No
|
1
|
| Hull
structure bounding membrane LNG tanks
|
Equivalent to wet
(repair will damage insulation)
|
No
|
2
|
| Penetrations
in upper deck for LNG tank domes
|
No
(covered by seal)
|
No
|
3
|