2 Special consideration process
2.1 General
2.1.1 To ensure that special consideration is undertaken in a consistent
manner, with an appropriate degree of rigour and in compliance with the applicable
Classification and Certification (Rule) requirements for materials, the Special
Consideration process shall be conducted in accordance with the steps given in Ch 1, 2.1 General 2.1.2.
2.1.2 This Section gives the steps to be taken for special consideration. Each
step is outlined in Ch 1, 2.2 Step 1: Initial review of Client's proposal to
Ch 1, 2.6 Step 5: Verification of Client implementation of agreed measures respectively including the objectives
and output associated with each step:
- Step 1: Initial review of Client’s proposal;
- Step 2: Identification of specific concerns regarding the
proposal;
- Step 3: Discussion and submission of measures taken and
evidence submitted by the Client to address the specific concerns
identified;
- Step 4: Review and technical justification of the measures
taken;
- Step 5: Verification of Client implementation of agreed
measures via survey, if necessary.
2.1.3 In general, communication between LR and Client will be through the local office.
2.2 Step 1: Initial review of Client's proposal
2.2.1 The Client initially informs LR of the intention to use a material that is out of the
scope of the Rules at the concept or design stage.
2.2.2 The following information shall be submitted for special consideration by the initial
review:
- Equipment / component descriptions where the material application is
proposed;
- Documentation (e.g. structural drawings showing the items in
question as required by design appraisal (reference is to be made to the
applicable Sections of LR’s Rules and Codes);
- Welding details;
- Operational environment/limitations, including design temperatures, load
conditions and service environment;
- Supporting documents, e.g. previous designs, reasoning behind the material
application, etc.;
- Reference relevant Rules, Codes and Standards for Classification or
Certification, as applicable;
- Identification of primary or secondary structural members as required in the
relevant design Rules and/or Codes;
- Proposed material specification and national and/or international
standards;
- Other supporting information, as required.
2.2.3 An initial review is undertaken to confirm that the proposal qualified for special
consideration. Based upon the outcome of the initial review conducted by LR, the
Client will either receive an acceptance or rejection in principle, including the
reasoning that led to the decision. It is possible for the Client to appeal against
this decision and provide further justification to support their case.
2.2.4 In order to ensure an efficient review process, Clients should submit the information
listed in Ch 1, 2.2 Step 1: Initial review of Client's proposal 2.2.2 as comprehensively as possible. Discussions at an
early stage (e.g. concept design stage) with LR specialists are encouraged for a
smooth and timely approval process.
2.2.5 The initial review will be based on the information submitted in conjunction with
stress calculations submitted by the Client, which may not have been independently
verified by LR. If during the subsequent LR design appraisal stage, the designed
service conditions (including load conditions, stress levels, environment etc.) for
the material application concerned are found to be incorrect, it will be the
responsibility of the Client to ensure appropriate action is taken to achieve
compliance. This may result in the initial review stage of the Special Consideration
process being repeated.
2.3 Step 2: Identification of specific concerns
2.3.1 Further to the positive outcome of the initial review and an acceptance in principle,
LR will identify the specific concerns highlighted during the initial review of the
proposal. The result will be a list of further considerations or specific concerns
to be addressed by the Client.
2.3.2 The further considerations or specific concerns need to include all root causes of
the specific failures in material function and performance through-life.
2.3.3 The further considerations and the specific concerns may include, but are not limited
to:
- Concerns raised due to the restriction of the Rule requirement, i.e. the reason
why the material application is not in the scope of the current Rules and
Regulations;
- Reported failures in similar industrial applications;
- Engineers’ and specialists’ knowledge and experience in the areas relevant to
the material application;
- Applicable concerns from previous similar cases;
- Possible failures identified by the Client based on their knowledge and
expertise;
- Risks associated with this material application with respect to possible
material failures.
2.3.4 In particular regard to item (f) of Ch 1, 2.3 Step 2: Identification of specific concerns 2.3.3, the specific material failures shall be scrutinised throughout all
the scenarios of the material life span as categorised in (a) to (i) of this
paragraph, if applicable, in order to identify the specific concerns that could act
as the root causes of the possible failures:
- Design accuracy and safety margin demonstrated in structural and stress analysis
and calculation reports, etc., where applicable;
- demonstrated in structural and stress analysis and calculation reports, etc.,
where applicable;
- Material selection, where the relevant design codes, material standards and
material selection principles or methods shall be referred to;
- Manufacturing processes, including technology and capacity, chemical composition
and microstructure (if applicable), processes and quality control, sampling and
testing, and maximum permissible manufacturing defects;
- Material property degradation during the fabrication processes, e.g. cutting,
forming and welding/joining, such as strain ageing, welding HAZ properties and
susceptibility to hydrogen cracking and embrittlement of high strength steels
from supporting documents such as associated welding procedures and
qualification records, testing and inspection plans and acceptance
criteria;
- Material property degradation due to the service environment, such as chemical
attack (e.g. hydrogen embrittlement and stress corrosion), and service
temperatures;
- Material property degradation in extreme load conditions, including impact and
strain rate effects, fatigue propagation etc.;
- Sampling, testing and procedure qualifications shall be representative of the
worst case scenarios; Quality control and inspection practices including
acceptance criteria and procedures, with the achievable detection limits of the
techniques in use;
- Service records and periodic inspection reports, if existing
structures/machinery are involved.
2.4 Step 3: Discussion and submission of measures
2.4.1 The identified concerns are then communicated and discussed with the Client in order
for them to provide evidence and/or take measures to address and mitigate them.
2.4.2 In order to eliminate the root causes of possible failures, as listed in the specific
concerns and identified in step 2, the Client shall agree to take measures and to
demonstrate that the possible failures shall be prevented sufficiently and
effectively. Submission of such measures shall include, but are not limited to, the
following items:
- Works approval status of the material supplier;
- Capabilities of the material fabricator, e.g. company’s historical data and
product performance records, if available;
- Sufficiently detailed stress calculations and fatigue assessments for all
required design conditions;
- Manufacturer or fabricator’s Inspection and Testing Plan (ITP);
The ITP shall
provide useful information on the quality control aspects identified by the
manufacturer, based on which local LR Surveyors can examine the execution of
manufacturing and the ITP. An ITP shall include a minimum of the following
aspects:
- Material designations and specifications in accordance with recognised
National and/or International Standards.
- Details of the material manufacturing and heat treatment processes,
including quality control aspects.
- Mechanical testing plans and procedures, including sampling plans,
frequency and acceptance criteria.
- Material fabrication/welding procedures, quality control and inspection
plans, including welding repair procedures if applicable.
- A specific testing program and defined acceptance criteria based on the concerns
raised during the “initial review” and “identification of specific concerns”
stages, if applicable. The Client’s research regarding the material service
conditions, expected material behaviour/performance and life span, including
possible analysis of material failure modes and material related structural
failures, if available;
- Level/extent of NDE, which needs to be suitable for the design details and the
application of the proposed material and weld types;
- Findings from relevant research regarding the aforementioned aspects, if
available;
- Any applicable test results regarding the aforementioned aspects, if
available;
- Inherent safety factors relating to the material application.
2.5 Step 4: Review and technical justification
2.5.2 If during the review, a need for additional information is identified, this will be
requested from the Client.
2.5.3 LR will assess whether the measures taken have adequately and effectively addressed
the concerns, and whether the material application can ensure the structural
integrity, safety, and component performance in service. Justification and evidence
offered to address the concerns raised may take the form of the following items:
- Material specifications and requirements for material quality and selection are
demonstrated as being suitable for the design purpose by means of Structural
Integrity and Safety Assessment or Fit For Service Assessment in compliance with
the relevant Standards, if necessary;
- Conservatism in the design calculations for the load cases, and
service/environment conditions;
- Sufficient manufacturing capability demonstrated with product history and
performance data, if available;
- Testing results, particularly with regard to the sampling procedure for the
representative properties and worst-case scenarios;
- Sufficient capability of fabrication practices, inspection and quality control
for a minimum level of defects in a new build structure;
- Risk of material failure in service related to material properties
mitigated.
2.6 Step 5: Verification of Client implementation of agreed measures
2.6.1 Where applicable, the LR Surveyors on site will be informed of the agreed
requirements for the manufacturing and testing procedures. These will include
activities requiring LR witnesses during manufacturing, material testing,
fabrication and inspection, in order to verify compliance during the manufacturing
and construction stages.
2.6.2 Confirmation of compliance with the agreed requirements shall be documented. In the
case of non-compliance, it shall be resolved prior to the product entering into
service.
|