E


4 ALBERT EMBANKMENT LONDON SE1 7SR

Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210


MSC.1/Circ.1671

14 July 2023


UNIFIED INTERPRETATION ON IMPLEMENTATION

OF REGULATION 2.10.3 OF THE 2009 MODU CODE, REGULATION 2.8.2 OF THE 1989 MODU CODE AND REGULATION 2.7.2 OF THE 1979 MODU CODE


  1. The Maritime Safety Committee, at its 107th session (31 May to 9 June 2023), approved the Unified interpretation on implementation of regulation 2.10.3 of the 2009 MODU Code, regulation 2.8.2 of the 1989 MODU Code and regulation 2.7.2 of the 1979 MODU Code, prepared by the Sub-Committee on Ship Design and Construction, at its ninth session, as set out in the annex.


  2. Member States are invited to apply the annexed unified interpretations and to bring them to the attention of all parties concerned.


***



I:\CIRC\MSC\1\MSC.1-Circ.1671.docx

MSC.1/Circ.1671

Annex, page 1


ANNEX


UNIFIED INTERPRETATION ON IMPLEMENTATION

OF REGULATION 2.10.3 OF THE 2009 MODU CODE, REGULATION 2.8.2 OF THE 1989 MODU CODE and REGULATION 2.7.2 OF THE 1979 MODU CODE


  1. In the context of regulation 2.10.3 of the 2009 MODU Code, regulation 2.8.2 of the 1989 MODU Code and regulation 2.7.2 of the 1979 MODU Code, the use of the phrase "new installation of materials which contain asbestos should be prohibited"1 means that:


    On or after 1 January 2024:


    1. materials containing asbestos should be prohibited from being installed on board; and


    2. any repairs, replacements, maintenance or additions to working parts2 of a MODU should be documented with an asbestos-free declaration for the materials used (see appendix).3


  2. Notwithstanding the above, existing materials stowed on board before 1 January 2024 are not prohibited from being retained on board but should not be installed unless they can be documented to be asbestos-free before use/installation.


  3. During surveys required by the 1979, 1989 and 2009 MODU Codes, the Administration or recognized organization acting on their behalf in consultation with the person responsible to control asbestos-containing material on board, should:


    1. audit available documentation, including asbestos-free declarations and other supporting documentation, based on the Guidelines for maintenance and monitoring of onboard materials which contain asbestos on board MODUs (MSC.1/Circ.[…]); and


    2. verify that materials which are documented to contain asbestos, as prohibited by regulation 2.10.3 of the 2009 MODU Code, regulation 2.8.2 of the 1989 MODU Code and regulation 2.7.2 of the 1979 MODU Code, have not been installed on board after 1 January 2024.


1 "Materials which contain asbestos" means that asbestos is present in the product/material above the threshold value stipulated in row A-1 of table A of appendix 1 to resolution MEPC.269(68).


2 Working parts here means product/material as listed in resolution MEPC.269(68)) in the structure, machinery, electrical installations and equipment covered by the 1979, 1989 and 2009 MODU Codes.


3 The list of structures and/or equipment in the appendix is intended to show examples and should not be seen as exclusive.


I:\CIRC\MSC\1\MSC.1-Circ.1671.docx

MSC.1/Circ.1671

Annex, page 2


APPENDIX


Structure and/or equipment

Component

Propeller shafting

Packing with low pressure hydraulic piping flange Packing with casing

Clutch Brake lining

Synthetic stern tubes

Diesel engine

Packing with piping flange Lagging material for fuel pipe Lagging material for exhaust pipe

Lagging material turbocharger

Turbine engine

Lagging material for casing

Packing with flange of piping and valve for steam line, exhaust line and drain line

Lagging material for piping and valve of steam line, exhaust line and drain line

Boiler

Insulation in combustion chamber Packing for casing door

Lagging material for exhaust pipe Gasket for manhole

Gasket for hand hole

Gas shield packing for soot blower and other hole Packing with flange of piping and valve for steam line, exhaust line, fuel line and drain line

Lagging material for piping and valve of steam line, exhaust line, fuel line and drain line

Exhaust gas economizer

Packing for casing door Packing with manhole Packing with hand hole

Gas shield packing for soot blower

Packing with flange of piping and valve for steam line, exhaust line, fuel line and drain line

Lagging material for piping and valve of steam line, exhaust line, fuel line and drain line

Incinerator

Packing for casing door Packing with manhole Packing with hand hole

Lagging material for exhaust pipe

Auxiliary machinery (pump, compressor, oil purifier, crane)

Packing for casing door and valve Gland packing

Brake lining

Heat exchanger

Packing with casing Gland packing for valve

Lagging material and insulation

Valve

Gland packing with valve, sheet packing with piping flange

Gasket with flange of high pressure and/or high temperature

Pipe, duct

Lagging material and insulation



I:\MSC\1\MSC.1-Circ.1671.docx

MSC.1/Circ.1671

Annex, page 3


Structure and/or equipment

Component

Tank (fuel tank, hot water, tank, condenser), other equipment (fuel strainer, lubricant oil

strainer)

Lagging material and insulation

Electric equipment

Insulation material

Airborne asbestos

Wall, ceiling

Ceiling, floor and wall in accommodation area

Ceiling, floor, wall

Fire door

Packing, construction and insulation of the fire door

Inert gas system

Packing for casing, etc.

Air conditioning system

Sheet packing, lagging material for piping and flexible joint

Miscellaneous

Ropes

Thermal insulating materials Fire shields/fire proofing Space/duct insulation Electrical cable materials Brake linings

Floor tiles/deck underlay Steam/water/vent flange gaskets Adhesives/mastics/fillers

Sound damping Moulded plastic products Sealing putty

Shaft/valve packing

Electrical bulkhead penetration packing Circuit breaker arc chutes

Pipe hanger inserts

Weld shop protectors/burn covers

Fire-fighting blankets/clothing/equipment Concrete ballast

Brake shoes Coating materials Insulation materials

Seals




I:\MSC\1\MSC.1-Circ.1671.docx