2.1.1 Extended
controls on structural alignment, fit up and workmanship standards
are to be applied in accordance with the ShipRight Construction
Monitoring Procedure, to areas of the ship structure that have
been requested or have been shown by other ShipRight procedures to
be in need of particular attention. The ShipRight Construction Monitoring
Procedure is mandatory when one or more of the procedures indicated
in Pt 3, Ch 16, 3 Structural design assessment, Pt 3, Ch 16, 4 Fatigue design assessment, or Pt 3, Ch 16, 5 Whipping design assessment have
been applied, whether voluntarily or on a mandatory basis. Where the
relevant procedures have been applied, the ShipRight notation CM is
to be assigned, see also
Pt 1, Ch 2, 2.3 Class notations (hull) 2.3.17.