9.1.1 When
the Surveyors have drawn attention to significant faults or deficiencies
in the Quality System or its operation and these have not been rectified
within a period of time acceptable to LR, the approval of the system,
together with the associated certification, will be withdrawn and
the shipyard's name deleted from the List of Shipyards Approved
to the Requirements of the Quality Assurance Scheme.
9.1.2 If
a significant period of time elapses between such withdrawal and any
application for reinstatement, the reapproval procedures, if agreed
to by the Committee, may require a restructuring of the Quality Management
System and will always require a complete re-examination as for an
initial assessment.