6.1.1 In
the first instance applications for approval under this Scheme will
be considered on the recommendation of the local Surveyors.
6.1.2 After
receipt and appraisal of the main quality documentation, an assessment
of the shipyard is to be carried out by the Surveyors to examine all
aspects of the Quality System applicable to hull construction.
6.1.3 The
Surveyors will review the quality arrangements proposed by the Shipbuilder
at the shipyard. They may advise as to how the proposed Quality System
might be improved and where it is considered inadequate, advise how
it might be revised to be acceptable to LR.
6.1.4 For
assessment to Part 1 of the Scheme, the Surveyors will review the
Quality System in association with the quality documentation and will
check that all aspects of the System are established and in accordance
with the requirements of Pt 3, Ch 15, 3 Particulars to be submitted.
6.1.5 For
assessment of Part 2 of the Scheme, the Surveyors will confirm that
the requirements given in Pt 3, Ch 15, 3 Particulars to be submitted have
been fully implemented and are complied with by a detailed examination
of work in progress and by confirming that workmanship and the quality
level being consistently achieved are to their satisfaction.