4.2.1 A full flow automatic
chlorination system is to be installed. As guidance on the chlorination
system, a capacity of up to 400 mg/litre for a VLCC is to be installed.
4.2.2 Other tank washing
systems will be accepted provided they are to be acceptable to the
National Authority with whom the ship is registered and/or by the
Administration within whose territorial jurisdiction the ship is intended
to operate.
4.2.3 Care is to be
taken when designing the tanks to ensure to minimise crevices, corners
and other inaccessible areas that cannot be properly cleaned.