3.1.1 The Periodical
Surveys of boilers, machinery, electrical installations and control
engineering systems are to be in accordance with the relevant requirements
of Pt 1, Ch 3 Periodical Survey Regulations of the Rules for Ships,
so far as these are applicable.
3.1.2 All sea
connections are to be opened up as part of the machinery survey, but
where this is not practicable the Committee will be prepared to consider
alternative proposals having regard to the circumstances of each case,
provided full particulars are submitted.