5.1.1 Before
a new installation (or any alteration or addition to an existing installation)
is put into service, trials are to be carried out. These trials are
in addition to any acceptance tests which may have been carried out
at the manufacturers’ works and are to be based on the test
schedules list as required inPt 6, Ch 1, 1.2 Plans 1.2.1.