2.1.1 Before
the work is commenced, plans in triplicate of all machinery items,
as detailed in the Chapters giving the requirements for individual
systems, are to be submitted for consideration. The particulars of
the machinery, including power ratings and design calculations, where
applicable, necessary to verify the design, are also to be submitted.
Any subsequent modifications are subject to approval before being
put into operation. It is not necessary for plans and particulars
to be submitted for each ship, provided the basic plans for the machinery
installation have previously been approved. Any alterations to basic
design, materials or manufacturing procedure are to be re-submitted
for consideration.