1.2.1 The following
plans are to be submitted for consideration, together with particulars
of materials and the maximum shaft power and revolutions per minute:
- Sectional assembly.
- Shafts, sealing devices, gears and couplings.
- Steering mechanisms with details of ratings.
- Bearing specifications.
- Schematic piping systems.
- Propeller/impeller where the diameter exceeds 1 m.
- For CPP installations, pitch control device.
- Structure of the tunnel showing details and thicknesses.