When the application of inert gas is required by 11.1.1, before gas-freeing,
the cargo tanks shall be purged with inert gas through outlet pipes with cross-sectional
area such that an exit velocity of at least 20 m/s can be maintained when any three
tanks are being simultaneously supplied with inert gas. The outlets shall extend not
less than 2 m above the deck level. Purging shall continue until the concentration of
hydrocarbon or other flammable vapours in the cargo tanks has been reduced to less than
2% by volume.