Section 9 In-service survey
Clasification Society 2024 - Version 9.40
Clasifications Register Guidance Information - Guidance Notes for Air Lubrication System Guidance Notes, January 2020 - Chapter 1 Air Lubrication System Guidance Notes - Section 9 In-service survey

Section 9 In-service survey

9.1 General

9.1.1 As part of the Periodic Surveys (Class, Safcon and Loadline), LR Surveyors will examine the hull, hull appendages, sea chests and sea connections. As part of these surveys, the breakdown of coatings, shell erosion, sea chest condition and integrity of sea connections and their associated valves would be confirmed. LR Surveyors would not be surveying the equipment associated with the system itself since it is not a classed system, e.g. they would not survey the air compressors and inboard piping. Any electrical panels would be generally examined as part of the five yearly survey of electrical equipment.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.