A description of the system and a listing of procedures
                           for checking that each item of the equipment is working properly during
                           the full cycle of the tanker operation. This includes a listing of
                           the parameters to be monitored such as inert gas main pressure, oxygen
                           concentration in the delivery main, oxygen concentration in the cargo
                           tanks, temperature at the scrubber outlet and blower outlet, blower
                           running current or power, scrubber pump running current or power,
                           deck seal level during inert gas discharge to cargo tanks at maximum
                           rate, deck seal level at nil discharge, etc. Established values for
                           these parameters during acceptance trials should be included, where
                           relevant.