1 If the transverse watertight bulkheads in a
region of the ship are carried to a higher deck which forms a vertical
step in the bulkhead deck, openings located in the bulkhead at the
step may be considered as being located above the bulkhead deck. Such
openings should then comply with regulation 17 and should be taken
into account when applying regulation 7-2.
2 All openings in the shell plating below the
upper deck throughout that region of the ship should be treated as
being below the bulkhead deck and the provisions of regulation 15
should be applied. See figure below.