6.1 Reception facilities should be designed, taking
into account the ship types that may be anticipated to use them and
consideration should be given to the requirements for ballast tank
cleaning that may take place and of repair facilities in the area(s)
the reception facility serves.
6.2 Details of the capabilities and any capacity
limitations of reception process (facilities and equipments) should
be made available to ships wishing to use the facility. The details
made available to ships should include but not be limited to:
-
.1 maximum capacity (volume or weight) of sediment;
-
.2 maximum volume or weight that can be handled
at any one time;
-
.3 packaging and labelling requirements;
-
.4 hours of operation;
-
.5 ports, berths, areas where access to the facility
is available;
-
.6 ship-to-shore transfer details;
-
.7 if ship or shore crew are required for the
transfer;
-
.8 contact details for the facility;
-
.9 how to request use of the facility including
any notice period and what information is required from the ship;
-
.10 all applicable fees; and
-
.11 other relevant information.