6.1
The model test programme should be approved
by the Administration in advance.
6.2 Tests should be documented by means of a report
and a video or other visual records containing all relevant information
on the model and the test results, which are to be approved by the
Administration. These should include, as a minimum, the theoretical
and measured wave spectra and statistics (HS, TP,
TZ) of the wave elevation at the 3 different locations
in the basin for a representative realisation, and for the tests with
the model, the time series of main statistics of the measured wave
elevation close to the wave maker and records of model roll, heave
and pitch motions, and of the drift speed.