3.1.1 Product Verification is to establish that the construction of the submarine and the
products procured for the construction of the submarine comply with the applicable
project specifications, Rules, Codes and standards previously verified during
Standards Justification.
3.1.2 The approach to verification documented in the Product Verification Plan is to be
agreed between the submarine builder and LR prior to any verification activity and
in accordance with the Submarine Assurance Plan.
3.1.3 Prior to verification, details of the builders and product manufacturers systems for
quality and process management are to be provided which readily identify the
required verification activities that provide Product Verification.
3.1.4 The scope of verification to be carried out by LR and the roles of the entities
involved is to be in accordance with the Submarine Assurance Plan.
3.1.5 Verification activities are to include a combination of: Works approval, survey of
materials, Inspection, survey of production, Document Review, Installation Survey,
witness of Testing and Trials in a documented process.
3.1.6 Arrangements for accessing product related information and documentation and allowing
comparison between the design, construction and product related information and
documentation and the project specifications, Rules Codes and standards are to be
provided.
3.1.7 Arrangements for reporting the results of verification activities are to be defined.
Consideration is to be given to the impact on current and proposed verification
activities.
3.1.8 Verification is to confirm that the Product Verification Plan is consistent with the
Standards Plan and Justification Document and the Design Verification Plan following
any revision necessary as a result of the Standards Justification and the Design
Verification processes respectively.
3.1.9 Verification is to confirm that the construction of the submarine and the
manufacturing of products procured for the construction of the submarine comply with
an approved design previously verified and during Design Verification.
3.1.10 Verification is to confirm that the construction of the submarine and the
manufacturing of products procured for the construction of the submarine comply with
the applicable project specifications, Rules, Codes and standards previously
verified and considered acceptable solutions during Standards Justification.
3.1.11 Verification is to confirm that the submarine construction and product manufacturing
process are appropriate for the materials used and do not reduce the material
properties below allowable limits.
3.1.12 Verification is to confirm that quality controls used are appropriate for the
manufacturing processes, materials used and in accordance with the project
specifications, Rules, Codes and standards.
3.1.13 Verification is to take account of Whole Boat requirements.
3.1.14 Verification activities are to be appropriate for the safety criticality category of
the submarine system, equipment or component.
3.1.15 Verification is to confirm that adequate processes are in place for the traceability
of materials and components appropriate to the safety criticality category.
3.1.16 Verification is to confirm that materials and workmanship for the construction of the
submarine and the products procured for the construction of the submarine are of
suitable quality and free from defects.
3.1.17 Arrangements for managing non-compliances in accordance with their categorisation are
to be agreed.
3.1.18 LR will notify the submarine builder or product manufacturer of any non-conformances
at the earliest opportunity.
3.1.19 Verification is to confirm that a change control system to assess the impact of
change on design, to manage the verification of change and inclusion of change into
the build of the submarine.
3.1.20 LR is to be advised of any non-compliance identified during the construction of the
submarine or product manufacturing. The impact of non-compliances is to be
established. Proposed repairs or modifications are to be considered for their impact
on the design before they are undertaken.
3.1.21 Significant repairs and modifications and any consequential operating constraints are
to be agreed by LR, the Navy and the Naval Administration. Repairs and modifications
are to be recorded in the product verification report. The Submarine Assurance Plan
is to be updated and re-verification carried out as necessary.
3.1.22 Objective Quality Evidence to demonstrate compliance at key stages of manufacture and
construction is to be established and retained by the submarine builder and product
manufacturer. It shall evidence the as built material state of the submarine,
system, equipment or component, including non-compliances.