2.2 A fixed water-spraying system covering the
area of chain stoppers and hose couplings should be provided.
2.3 Air vent pipes to the forepeak tank should
be located as far as practicable from gas dangerous areas.
2.4 Where a forward bridge control position is
arranged on the forecastle or fore deck, provisions should be made
to the satisfaction of the Administration for emergency escape from
the bridge control position in the event of fire.
2.5 An emergency quick-release system should be
provided for the cargo hose and mooring systems. The design, location
and operation of such a system should be to the satisfaction of the
Administration.
2.6 The mooring system should be provided with
a tension meter continuously indicating the tension in the mooring
system during the bow loading operation. This recommendation may be
waived if the tanker has in operation a dynamic positioning system
to the satisfaction of the Administration.
2.7 An operation manual describing emergency procedures
such as activation of the emergency quick release system and precautions
in case of high tension in the mooring system, should be provided
on board.