Detailed requirements for conducting the operations described
                           in sections 4 and 5 particular
                           to the installation of the ship such as times to inert, purge and
                           gas-free each tank, sequence and number of tanks to be inerted, purged
                           and gas-freed, sequence and number of purge pipes/vents to be opened
                           or closed during such operations, etc.