1.14 The land-based and shipboard approval requirements
for ballast water management systems specified in these guidelines
are summarized below.
1.15 The manufacturer of the equipment should
submit information regarding the design, construction, operation and
functioning of the ballast water management system in accordance with
Part 1 of the annex. This information should be the basis for a first
evaluation of suitability by the Administration.
1.16 The ballast water management system should
be tested for Type Approval in accordance with the procedures described
in Parts 2 and 3 of the annex.
1.17 Successful fulfilment of the requirements
and procedures for Type Approval as outlined in Parts 2 and 3 of the
annex should lead to the issuance of a Type Approval Certificate by
the Administration.
1.18 When a Type Approved ballast water management
system is installed on board, an installation survey according to
section 8 should be carried out.