2.2.1 The Design Verification (DV) Plan is to be submitted by the submarine
designer.
2.2.2 The plan is to identify the systems, equipment and components within the scope of
verification defined in the Submarine Assurance Plan.
2.2.3 The plan is to provide a mapping of the systems, equipment and components within
scope to the applicable project specifications, Rules, codes or standards and the
corresponding design documentation to be used for verification.
2.2.4 The plan is to take account of the operating context for the systems, equipment and
components as defined System Operational Concept documentation.
2.2.5 The plan is to define Whole Boat requirements to be taken into account during
verification of the design.
2.2.6 The plan is to indicate the safety criticality category of the submarine system,
equipment or components to be verified in accordance with the safety criticality
defined in the System Operational Concept Document.
2.2.7 The plan is to include details of:
- Systems, equipment and components for which Design
Verification is to be carried out;
- Project specifications, Rules, Codes and standards to be
verified;
- Means of design verification to be carried out, e.g. design
review, modelling, testing etc.;
- Interfaces with submarine systems outside of scope;
- Additional specification requirements;
- Applicable Whole Boat requirements; and
- Any deviations with proposed equivalents or alternatives.
2.2.8 The plan is to describe the specific types of verification activities to be
undertaken, e.g. Internal Review, Design Review, Design Audit, Design Appraisal,
Independent Analysis, Modelling, Testing or assessment of in-service experience.