                                    Construction stage
                                    
                                    
                                  | 
                                  
                                    
                                  | 
                                 
                                    Inspection items
                                    
                                    
                                  | 
                              
                              
                                 | Primary surface
                                    preparation
                                    
                                  | 
                                 1
                                    
                                  | 
                                 The surface temperature of steel, the
                                    relative humidity and the dew point shall be measured and recorded before the
                                    blasting process starts and at times of sudden changes in weather.
                                    
                                  | 
                              
                              
                                 | 2
                                    
                                  | 
                                 The surface of steel plates shall be
                                    tested for soluble salt checked for oil, grease and other
                                    contamination.
                                    
                                  | 
                              
                              
                                 | 3
                                    
                                  | 
                                 The cleanliness of the steel surface
                                    shall be monitored in the shop primer application process.
                                    
                                  | 
                              
                              
                                 | 4
                                    
                                  | 
                                 The shop primer material shall be
                                    confirmed to meet the requirements of 2.3 of table 1. Verified by manufacturer. 
                                    
                                  | 
                              
                              
                                 | Thickness
                                    
                                  | 
                                  
                                    
                                  | 
                                 If compatibility with the main coating
                                    system has been declared, then the thickness and curing of the zinc silicate
                                    shop primer to be confirmed to conform to the specified values.
                                    
                                  | 
                              
                              
                                 | Block assembly
                                    
                                  | 
                                 1
                                    
                                  | 
                                 After completing construction of the
                                    block and before secondary surface preparation starts, a visual inspection for
                                    steel surface treatment including edge treatment shall be carried out.
                                    
                                  | 
                              
                              
                                 | Any oil, grease or other visible
                                    contamination to be removed.
                                    
                                  | 
                              
                              
                                 | 2
                                    
                                  | 
                                 After blasting/grinding/cleaning and
                                    prior to coating, a visual inspection of the prepared surface shall be carried
                                    out.
                                    
                                  | 
                              
                              
                                 | On completion of blasting and cleaning
                                    and prior to the application of the first coat of the system, the steel surface
                                    shall be tested for levels of remaining soluble salts in at least one location
                                    per block.
                                    
                                  | 
                              
                              
                                 | 3
                                    
                                  | 
                                 The surface temperature, the relative
                                    humidity and the dew point shall be monitored and recorded during the coating
                                    application and curing.
                                    
                                  | 
                              
                              
                                 | 4
                                    
                                  | 
                                 Inspection to be performed of the steps
                                    in the coating application process mentioned in table 1. 
                                    
                                  | 
                              
                              
                                 | 5
                                    
                                  | 
                                 DFT measurements shall be taken to prove
                                    that the coating has been applied to the thickness as specified.
                                    
                                  | 
                              
                              
                                 | Erection
                                    
                                  | 
                                 1
                                    
                                  | 
                                 Visual inspection for steel surface
                                    condition, surface preparation and verification of conformance to other
                                    requirements in table 1, and the agreed specification to be performed.
                                    
                                    
                                  | 
                              
                              
                                 | 2
                                    
                                  | 
                                 The surface temperature, the relative
                                    humidity and the dew point shall be measured and recorded before coating starts
                                    and regularly during the coating process.
                                    
                                  | 
                              
                              
                                 | 3
                                    
                                  | 
                                 Inspection to be performed of the steps
                                    in the coating application process mentioned in table 1. 
                                    
                                  |