The SRP should include information on how the type and amount
of Hazardous Materials will be managed, as required by regulation 9.3 of the Convention and specify
the facility's approach for managing each Hazardous Material. Special
attention should be paid to the types and quantities of Hazardous
Materials on the ship. If ship-specific conditions require deviation
from normal practices for managing Hazardous Materials, the appropriate
ship-specific measures should be described in detail in the SRP. In
order to avoid confusion, it is recommended that the SRP should use
the same nomenclature and identification scheme as those included
in the IHM.
The SRP should also contain additional information on the
management of Hazardous Materials as required in Appendix
5 of the Convention (also known as the DASR). Specifically,
the SRP should describe where the Hazardous Materials are to be processed
or disposed of if the operation is not being conducted at the Ship
Recycling Facility. The SRP should state that the removal of Hazardous
Materials will be undertaken by responsible personnel who are trained
and authorized to do so.