Statutory Documents - IMO Publications and Documents - Resolutions - Maritime Safety Committee - Resolution MSC.370(93) – Amendments to The International Code for The Construction and Equipment of Ships Carrying Liquefied Gases In Bulk (IGC Code) – (Adopted on 22 May 2014) - Annex - Amendments to The International Code for The Construction and Equipment of Ships Carrying Liquefied Gases In Bulk (IGC Code) - Appendix 4 — Non-Metallic Materials - 5 Quality assurance and quality control (QA/QC)

5 Quality assurance and quality control (QA/QC)

  5.1 General

  5.1.1 Once a material has been selected, after testing as outlined in section 4 of this appendix, a detailed quality assurance/quality control (QA/QC) programme should be applied to ensure the continued conformity of the material during installation and service. This programme should consider the material starting from the manufacturer's quality manual (QM) and then follow it throughout the construction of the cargo system.

  5.1.2 The QA/QC programme should include the procedure for fabrication, storage, handling and preventive actions to guard against exposure of a material to harmful effects. These may include, for example, the effect of sunlight on some insulation materials or the contamination of material surfaces by contact with personal products such as hand creams. The sampling methods and the frequency of testing in the QA/QC programme should be specified to ensure the continued conformity of the material selected throughout its production and installation.

  5.1.3 Where powder or granulated insulation is produced, arrangements should be made to prevent compacting of the material due to vibrations.

  5.2 QA/QC during component manufacture

 The QA/QC programme in respect of component manufacture should include, as a minimum but not limited to, the following items.

  5.2.1 Component identification

  5.2.1.1 For each material, the manufacturer should implement a marking system to clearly identify the production batch. The marking system should not interfere, in any way, with the properties of the product.

  5.2.1.2 The marking system should ensure complete traceability of the component and should include:

  .1 date of production and potential expiry date;

  .2 manufacturer's references;

  .3 reference specification;

  .4 reference order; and

  .5 when necessary, any potential environmental parameters to be maintained during transportation and storage.

  5.2.2 Production sampling and audit method

  5.2.2.1 Regular sampling is required during production to ensure the quality level and continued conformity of a selected material.

  5.2.2.2 The frequency, the method and the tests to be performed should be defined in QA/QC programme; for example, these tests will usually cover, inter alia, raw materials, process parameters and component checks.

  5.2.2.3 Process parameters and results of the production QC tests should be in strict accordance with those detailed in the QM for the material selected.

  5.2.2.4 The objective of the audit method as described in the QM is to control the repeatability of the process and the efficacy of the QA/QC programme.

  5.2.2.5 During auditing, auditors should be provided with free access to all production and QC areas. Audit results should be in accordance with the values and tolerances as stated in the relevant QM.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.