3.11.4 Arrangement II
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Specifications and Manuals - Inert Gas Systems - 3 Function and Design Considerations - 3.11 Arrangements for inerting, purging and gas-freeing (regulation 62.13) - 3.11.4 Arrangement II

3.11.4 Arrangement II

 Gas is introduced at the bottom of the tank and vented from the top. Gas replacement is by the dilution method. This arrangement introduces the gas through a connection between the inert gas deck main (just forward of the mechanical nonreturn valve) and the bottom cargo lines (see figure 12). A special fixed gas-freeing fan may also be fitted. Exhaust gas may be vented through individual vent stacks or, if valves are fitted to isolate each cargo tank from the inert gas main, through this main to the mast riser or high velocity vent.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.