1
|
Title (number and title of
regulation(s))
|
|
|
2
|
Origin of the requirement
(original proposal document)
|
|
|
3
|
Main reason for the
development (extract from the proposal document)
|
|
|
4
|
Related output
|
|
|
5
|
History of the discussion
(approval of work programmes, sessions of sub-committees,
including CG/DG/WG arrangements)
|
|
|
6
|
Impact on other instruments
(codes, performance standards, guidance circulars,
certificates/records format, etc.)
|
|
|
7
|
Technical
background
|
7.1
|
Scope and objective (to
cross check with items 4 and 5 in part II of the
checklist)
|
|
|
7.2
|
Technical/operational
background and rationale (e.g. summary of FSA study, if
available, or engineering challenge posed)
|
|
|
7.3
|
Source/derivation of
requirement (non-mandatory instrument, industry standard,
national/regional requirement)
|
|
|
7.4
|
Short summary of
requirement (what is the new requirement – in short and lay
terms)
|
|
|
7.5
|
Points of discussions
(controversial points and conclusion)
|
|
|