4.1.1 The commissioning testing report should cover all aspects of the commissioning
testing and should be written by the party conducting the testing.
This document should be ship-specific and contain at least the following
information:
- Ship Name;
- Ship IMO Number;
- Service Supplier Details;
- Ballast pump capacity and ballast volume of number of tank(s) used;
- BWMS type, model and manufacturer;
- IMO Type Approval certificate number and issuing authority – wherever
possible a copy of the certificate should be submitted;
- Uptake sampling information
- Time
- Location;
- Discharge sampling information
- Time
- Location;
- Reporting of the sampling analysis results
- Methods used
- Results (including raw data);
- Reporting of assessment of self-monitoring parameters
- List of applicable parameters and set limits
- Observed limits of parameters, evidence of data, i.e.
screen shots, photographs.
The reports should be written in or translated into English.