9.1.1 This is an optional certification module in IEC 61400-22 Wind turbines
– Part 22: Conformity testing and certification and IECRE OD-502 Project
Certification Scheme; surveillance should be undertaken for ‘other
installations’ as directed by the applicant. The scope of the surveillance should be
developed by the certification body and agreed with the applicant before commencing
any surveillance.
9.1.2 The purpose of this module is to undertake surveillance to verify that
the ‘other installations’ are manufactured in accordance with their approved design
and to the intended quality, with reference to the design evaluation in Ch 2, 6 Other installations design evaluation.
Surveillance comprises audit, inspection, and document reviews by the certification
body.
9.1.3 According to IEC 61400-22 Wind turbines – Part 22: Conformity testing
and certification and IECRE OD-502 Project Certification Scheme, the
manufacturer of the main parts of the ‘other installations’ to be certified must
operate a quality system; the certification body should focus on the implementation
of the system during the manufacture of the project-specific installation.
9.1.4 IEC 61400-22
Wind turbines – Part 22: Conformity testing and
certification and IECRE OD-502
Project Certification Scheme requires
that project-specific surveillance scope should be based on a number of factors
including the following (refer to Paragraph 9.10.2, IEC 61400-22
Wind turbines –
Part 22: Conformity testing and certification and Paragraph 7.9.2, IECRE
OD-502
Project Certification Scheme for a full list of factors):
- the type and complexity of the ‘other installation’ in question;
- the manufacturer’s experience of delivering the scope for the
project-specific ‘other installation’;
- the suitability of the manufacturer’s quality system for the
project-specific ‘other installation’ under consideration, and any
certification for the quality system (e.g. certified to ISO 9001 Quality
Management);
- the certification body’s experience with the manufacturer;
- the extent of inspection by the applicant and its contractors;
- availability of quality control documents; and
- access to sub-contractor facilities and documentation.