2.1.1 The vessel arrangements shall be designed so as to minimise risks to personnel on
board, or embarked in boats onboard, suspended or alongside during launch and
recovery operations.
2.1.2 The design, construction, installation and operation of launch and recovery
appliances shall be appropriate for the defined operating conditions and arranged so
as to minimise risks to personnel on board, or embarked in boats on board, suspended
or alongside during launch and recovery operations.
2.1.3 The vessel arrangements and launch and recovery appliances shall be compatible with
the boats and watercraft assigned to them.
2.1.4 Arrangements shall provide for effective control over launch, recovery and alongside
operations.
2.1.5 Arrangements for the transfer of people, liquids or cargo to and from
the vessel to the sea surface or to watercraft alongside the vessel shall be
designed, constructed and maintained so as to minimise risks to personnel onboard or
alongside. (Requirements for underway replenishment are covered in Vol 3, Pt 1, Ch 5 Replenishment at Sea (RAS) Systems).
2.1.6 Appropriate Operator Guidance shall be provided.