| Name of Vessel:
|
|
GT:
|
|
| Vessel Type:
|
|
Capacity:
|
|
|
|
|
|
|
|
|
| Date of Development:
|
|
Developed by:
|
|
| Implementation Period:
|
From:
Until:
|
Implemented by:
|
|
| Planned Date of Next Evaluation:
|
|
|
|
|
|
|
|
|
|
|
|
|
1
|
MEASURES
|
Energy Efficiency Measures
|
Implementation
(including the starting date)
|
Responsible Personnel
|
| Weather Routeing
|
<Example>
Contracted with [Service providers] to use
their weather routeing system and start using
on-trial basis as of 1 July 2012.
|
<Example>
The master is responsible for selecting the
optimum route based on the information provided
by [Service providers].
|
| Speed Optimization
|
While the
design speed (85% MCR) is 19.0 kt, the maximum
speed is set at 17.0 kt as of 1 July 2012.
|
The master
is responsible for keeping the ship's speed. The
log-book entry should be checked every
day.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2
|
MONITORING
|
|
|
Description of monitoring tools
|
|
3
|
GOAL
|
|
|
Measurable goals
|
|
4
|
EVALUATION
|
|
|
Procedures of evaluation
|