1 Regulation 15 - Openings in watertight bulkheads in passenger ships
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Circulars - Maritime Safety Committee - MSC/Circular.736 – Interpretations of Vague Expressions in SOLAS Chapter II-1 – (Adopted on 21 June 1996) - Annex - Interpretations of Vague Expressions in SOLAS Chapter II-1 - Part B - Subdivision and stability - 1 Regulation 15 - Openings in watertight bulkheads in passenger ships

1 Regulation 15 - Openings in watertight bulkheads in passenger ships

  Paragraph 2.1

Where fixed services, for example, pipes, scuppers or electrical cables, are carried through watertight subdivision bulkheads, one or more prototypes representing the arrangements for the watertight penetrations shall be tested for a period of at least 30 minutes under hydraulic pressure equal to or greater than that corresponding to the actual location in the vessel in which they are to be installed. There should be no leakage through the prototype arrangement for the duration of the test. Watertight bulkhead penetrations which can be seal welded do not require prototype testing.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.