6.4.1 Prior to survey, the surveyor shall
examine the completeness of the documentation on board and its contents as a basis
for the survey.
6.4.2 For oil tankers subject to SOLAS regulation
II-1/3-10, on completion of the survey, the surveyor shall verify that the
update of the Ship Construction File (SCF) has been done whenever a modification of
the documentation included in the SCF has taken place.
6.4.2.1 For the SCF stored on board ship, the surveyor shall examine the information
on board ship. In cases where any major event, including, but not limited to,
substantial repair and conversion, or any modification to the ship structures; the
surveyor shall also verify that the updated information is kept on board the ship. If
the updating of the SCF on board is not completed at the time of survey, the surveyor
shall record it and require confirmation at the next periodical survey.
6.4.2.2 For the SCF stored in an onshore archive, the surveyor shall examine the list
of information included in the onshore archive. In cases where any major event,
including, but not limited to, substantial repair and conversion, or any modification
to the ship structures; the surveyor shall also verify that the updated information
is stored in the onshore archive by examining the list of information included in the
onshore archive kept on board the ship. In addition, the surveyor shall confirm that
the service contract with f the archive centre is valid. If the updating of the SCF
Supplement ashore is not completed at the time of survey, the surveyor shall record
it and require confirmation at the next periodical survey.
6.4.3 For oil tankers subject to SOLAS regulation
II-1/3-10, on completion of the survey, the surveyor shall verify any
addition and/or renewal of materials used for the construction of the hull structure
are documented within the Ship Construction File's list of materials.
6.4.4 For oil tankers with coatings of dedicated
seawater ballast tanks subject to PSPC standards (MSC.215(82)), and for crude oil
tankers as applicable with coatings of cargo oil tanks subject to the requirements of
MSC.288(87), on completion of the survey, the surveyor shall verify any maintenance,
repair, or recoating activities to these coatings are documented within the Coating
Technical File (CTF).