Part I of the Inventory should be developed using the following
3 steps. However, the order of these steps is flexible and can be
changed depending on the schedule of shipbuilding:
-
.1 collection of Hazardous Materials information;
-
.2 utilization of Hazardous Materials information;
and
-
.3 preparation of the Inventory (by filling out
standard format).