4.1 When considering the requirements of these
facilities many factors will have to be taken into account, these
should include but not be limited to:
-
.1 regional, national and local legislation which
will affect the facility and related to the items below;
-
.2 site selection;
-
.3 collection, handling and transport of sediment;
-
.4 sampling, testing and analysis of sediment;
-
.5 storage of sediment and storage conditions;
-
.6 estimated required capacity (volume/weight)
including moisture content of the sediment the facility will handle;
-
.7 environmental benefits and costs;
-
.8 proximity of available sites to local ballast
tank cleaning and repair facilities;
-
.9 effect on the environment in construction and
operation of the facility;
-
.10 training of facility staff;
-
.11 equipment required to off load sediment from
ships, such as cranes;
-
.12 human health;
-
.13 safety;
-
.14 maintenance;
-
.15 operational limitations; and
-
.16 waterway access, approaches and traffic management.