7.3.1 The thickness measurements shall be recorded
using the tables contained in Appendix 2 of Annex 10 of Annex B of resolution
A.744(18), as amended. It is recommended that these records be kept
in an electronic medium.
7.3.2 The thickness measurements shall be carried
out either prior to or, to the maximum extent possible, concurrently
with the close-up survey.
7.3.3 The minimum requirements for thickness measurements
for the CAS surveys shall be those set out in the table below:
|
Thickness Measurements Requirements
|
Within the cargo area:
- .1 Within the cargo area:
- .2 Three transverse sections
- .3 Each bottom plate
|
| 2. Measurements of structural members
subject to close-up survey according to 7.2.2, for general assessment and
recording of corrosion pattern
|
| 3. Suspect areas
|
| 4. Selected wind and water strakes
outside the cargo area.
|
| 5. All wind and water strakes within
the cargo area.
|
| 6. Internal structure in the fore and
aft peak tanks
|
| 7. All exposed main deck plates
outside the cargo area and all exposed first tier superstructure deck
plates
|
Note In conjunction with thickness measurement procedures, in
case of concern regarding residual throat thickness of the fillet weld
between the deck plate and deck longitudinals or possible detachment
of a deck longitudinal member, the attending surveyor may refer to the
Guidelines on the assessment of residual fillet weld between deck
plating and longitudinals adopted by resolution MEPC.147(54).
|
7.3.4 Where substantial corrosion is found, the
extent of the thickness measurements shall be increased in accordance
with Annex 4 of Annex B
of resolution A.744(18), as amended.
7.3.5 In addition, the thickness measurements
may be extended as considered necessary by the attending surveyors.
7.3.6 For areas in tanks where coatings are found
to be in GOOD condition, the extent of thickness measurements, according
to paragraph 7.3.3, may be specially considered by the RO. However,
sufficient thickness measurements shall be taken, in all cases, to
confirm the actual average condition and the maximum observed diminution
of the structure.
7.3.7 The thickness measurement to be taken shall
be sufficient to enable the reserve strength calculations in accordance
with Annex 12 of Annex
B of resolution A.744(18), as amended.
7.3.8 Transverse sections shall be chosen where
the maximum diminutions are expected to occur or are revealed from
deck plating thickness measurements. At least one transverse section
shall include a ballast tank within 0.5L amidships.