The design and operation of the NGHP carrier should be evaluated
by risk analysis early in the design process. Hazard identification
should be carried out based on the design. At a minimum, due consideration
should be given to the risks owing to fire and explosion related to
cargo holds, cargo handling systems, other systems related to cargo
and special features of the NGHP carrier.