5.3 Power interruptions and shut-down
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Resolutions - Maritime Safety Committee - Resolution MSC.64(67) - Adoption of New and Amended Performance Standards - (Adopted on 4 December 1996) - Annex 1 - Recommendation on Performance Standards for Integrated Bridge Systems (IBS). LR Note: This Annex 1 is obsolete following the adoption of SN.1/Circ.288. - 5 Technical Requirements - 5.3 Power interruptions and shut-down

5.3 Power interruptions and shut-down

  5.3.1 If subjected to an orderly shut-down, the IBS should, upon turn-on, come to an initial default state.

  5.3.2 After a power interruption full functionality of the IBS should be available after recovery 000 of all subsystems. The IBS should not increase the recovery time of individual subsystem functions after power restoration.

  5.3.3 If subjected to a power interruption the IBS should, upon restoration of power, maintain the configuration in use and continue automated operation, as far as practicable Safety related automatic functions should only be restored upon confirmation by the operator.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.