Ship ID:
IMO no.: _____________________
Ship's name: ___________________
Shipyard: _____________________
Hull no.:______________________
| Applicant:
|
|
Validation stage:
|
| Name:
|
____________________________
|
☐ Preliminary validation
☐ Final
validation
|
| Address:
|
____________________________
|
|
|
____________________________
|
Summary results of EPT-EEDI
| Load group
|
Seagoing condition EEDI
Calculation guidelines
|
Remarks
|
Continuous load (kW)
|
Intermittent load (kW)
|
| Ship service and
engine-room loads
|
|
|
|
| Accommodation and
cargo loads
|
|
|
|
| Total installed
load
|
|
|
|
| Diversity
factor
|
|
|
|
| Normal seagoing
load
|
|
|
|
| Weighted average
efficiency of generators
|
|
|
| PAE
|
|
|
| Validator details:
|
|
| Organization:
|
____________________________________________________________________
|
| Address:
|
____________________________________________________________________
|
|
|
____________________________________________________________________
|
This is to certify that the above-mentioned electrical loads and supporting documents
have been reviewed in accordance with EPT-EEDI Validation Guidelines and the review
shows a reasonable confidence for use of the above PAE in EEDI
calculations.
| Date of review:_______________________
|
Statement of validation no._________
|
This statement is valid on condition that the electric power characteristics of the ship
do not change.
|
|
Signature of Validator
|
|
|
_____________________________________________________
|
|
|
Printed name:
|
|
|
___________
|