4 Scenarios
considered
4.1 Case 1 refers to a day scenario in MVZ 1,
according to chapter 13 of the FSS Code, the 449 persons are initially
distributed as follows: 42 in deck 5; 65 in deck 6 (42 in the fore
part and 23 in the aft part); 26 in deck 7; 110 in deck 9; 96 in deck
10; and 110 in deck 11. Deck 8 (assembly station) is empty. In accordance
with paragraph 2.2 of appendix 1 to the Guidelines, all persons in
the cabins are assumed to simultaneously move into the corridors.
The corresponding initial conditions are:
MVZ 1 - Corridors
|
Persons
|
Initial density D (p/m2)
|
Initial specific flow Fs (p/(ms))
|
Calculated flow Fc (p/s)
|
Initial speed of persons S (m/s)
|
Deck 5 corridor 1
|
11
|
0.94
|
0.85
|
0.77
|
1.03
|
Deck 5 corridor 2
|
12
|
0.67
|
0.73
|
0.65
|
1.14
|
Deck 5 corridor 3
|
8
|
0.94
|
0.85
|
0.77
|
1.04
|
Deck 5 corridor 4
|
11
|
0.61
|
0.7
|
0.63
|
1.16
|
Deck 6 corridor 1
|
11
|
0.94
|
0.85
|
0.77
|
1.03
|
Deck 6 corridor 2
|
12
|
0.67
|
0.73
|
0.65
|
1.14
|
Deck 6 corridor 3
|
8
|
0.94
|
0.85
|
0.77
|
1.04
|
Deck 6 corridor 4
|
11
|
0.61
|
0.7
|
0.63
|
1.16
|
Deck 6 corridor 5
|
11
|
0.94
|
0.85
|
0.77
|
1.03
|
Deck 6 corridor 6
|
12
|
0.67
|
0.73
|
0.65
|
1.14
|
Deck 7 corridor 1
|
4
|
0.74
|
0.76
|
0.69
|
1.11
|
Deck 7 corridor 2
|
4
|
0.49
|
0.64
|
0.58
|
1.2
|
Deck 7 corridor 3
|
6
|
0.44
|
0.58
|
0.52
|
1.2
|
Deck 7 corridor 4
|
4
|
0.74
|
0.76
|
0.69
|
1.11
|
Deck 7 corridor 5
|
6
|
0.48
|
0.62
|
0.56
|
1.2
|
Deck 7 corridor 6
|
2
|
0.15
|
0.19
|
0.17
|
1.2
|
Deck 7 corridor 7
|
0
|
0
|
N.A.
|
N.A.
|
N.A.
|
Deck 7 corridor 8
|
0
|
0
|
N.A.
|
N.A.
|
N.A.
|
Deck 11 corridor 1
|
55
|
1.7
|
1.21
|
1.09
|
0.75
|
Deck 11 corridor 2
|
55
|
1.7
|
1.21
|
1.09
|
0.75
|
Deck 10 corridor 1
|
48
|
1.48
|
1.11
|
1
|
0.83
|
Deck 10 corridor 2
|
48
|
1.48
|
1.11
|
1
|
0.83
|
Deck 9 corridor 1
|
55
|
1.7
|
1.21
|
1.09
|
0.74
|
Deck 9 corridor 2
|
55
|
1.7
|
1.21
|
1.09
|
0.74
|
MVZ 1 Stairs, doors & corridors
|
Persons (N)
|
Total including those from other routes
|
Specific flow Fs in (p/(ms))
|
Max specific flow Fs (p/(ms))
|
Specific flow Fs (p/(ms))
|
Calculated flow Fc (p/s)
|
Speed of persons S (m/s)
|
Queue
|
Comments
|
From current route
|
Notes
|
Deck 5 door 1
|
34
|
34
|
2.28
|
1.3
|
1.3
|
1.17
|
N.A.
|
Yes
|
From corridors 1, 2 and 4
|
1
|
Deck 5 door 2
|
8
|
8
|
1.85
|
1.3
|
0.85
|
0.77
|
N.A.
|
|
From corridor 3
|
1
|
Deck 5 stair A
|
42
|
42
|
1.43
|
0.88
|
0.88
|
1.188
|
0.44
|
Yes
|
From doors 1 and 2
|
1, 2
|
Deck 6 door 1
|
34
|
34
|
2.58
|
1.30
|
1.3
|
1.17
|
N.A.
|
Yes
|
From corridors 1, 2, and 4;
|
1
|
Deck 6 door 2
|
8
|
8
|
0.85
|
1.30
|
0.85
|
0.77
|
N.A.
|
|
From corridor 3
|
1
|
Deck 6 stair A
|
42
|
84
|
2.32
|
0.88
|
0.88
|
1.188
|
0.44
|
Yes
|
From doors 1 and 2, from deck 5
|
1, 2
|
Deck 6 door 3
|
11
|
11
|
0.85
|
1.30
|
0.85
|
0.77
|
N.A.
|
|
From corridor 5
|
1
|
Deck 6 door 4
|
12
|
12
|
0.73
|
1.30
|
0.81
|
0.73
|
N.A.
|
|
From corridor 4
|
1
|
Deck 6 stair B
|
23
|
23
|
1.05
|
0.88
|
0.88
|
1.188
|
0.44
|
Yes
|
From doors 3 and 4
|
1, 2
|
Deck 7 corridor 8
|
8
|
92
|
0.78
|
1.3
|
0.78
|
1.88
|
1.09
|
|
From corridors 3 and 6, from deck 6,
stair A
|
1, 3
|
Deck 7 corridor 7
|
18
|
125
|
1.75
|
1.3
|
1.3
|
3.12
|
0.67
|
Yes
|
From corridors 2, 5 and 8, from deck
6, stair B
|
1, 4
|
Deck 7 stair C
|
8
|
133
|
3.21
|
0.88
|
0.88
|
1.232
|
0.44
|
Yes
|
From corridors 1, 4 and 7; up to deck
8
|
1, 2, 5
|
Deck 11 door 1
|
55
|
55
|
1.21
|
1.3
|
1.21
|
1.09
|
N.A.
|
|
To stair C
|
1
|
Deck 11 door 2
|
55
|
55
|
1.21
|
1.3
|
1.21
|
1.09
|
N.A.
|
|
To stair C
|
1
|
Deck 11 stair C
|
110
|
110
|
0.78
|
1.1
|
0.78
|
2.17
|
0.81
|
|
Down to deck 10
|
1, 2
|
Deck 10 door 1
|
48
|
48
|
1.11
|
1.3
|
1.11
|
1
|
N.A.
|
|
To stair C
|
1
|
Deck 10 door 2
|
48
|
48
|
1.11
|
1.3
|
1.11
|
1
|
N.A.
|
|
To stair C
|
1
|
Deck 10 stair C
|
96
|
206
|
1.49
|
1.1
|
1.10
|
3.08
|
0.55
|
Yes
|
Down to deck 9
|
1, 2
|
Deck 9 door 1
|
55
|
55
|
1.21
|
1.3
|
1.21
|
1.09
|
N.A.
|
|
To stair C
|
1
|
Deck 9 door 2
|
55
|
55
|
1.21
|
1.3
|
1.21
|
1.09
|
N.A.
|
|
To stair C
|
1
|
Deck 9 stair C
|
110
|
316
|
1.88
|
1.1
|
1.10
|
3.08
|
0.55
|
Yes
|
Down to deck 8
|
1,
2
|
Deck 8 path 1
|
0
|
200
|
0.96
|
1.3
|
0.96
|
1.92
|
0.95
|
|
To assembly stat
|
1, 6
|
Deck 8 path 2
|
0
|
249
|
0.96
|
1.3
|
0.96
|
2.4
|
0.95
|
|
To assembly stat
|
1,
6
|
Note
1 The specific flow Fs in is the
specific flow entering the element of the escape route; the maximum
specific flow is the maximum allowable flow given in table 1.3 of
appendix 1 of the Guidelines; the specific flow is the one applicable
for the calculations i.e., the minimum between Fs in
and the maximum allowable; when Fs in is greater than
the maximum allowable, a queue is formed.
Note
2 Some stairs are used by both persons coming
from below (or above) and persons coming from the current deck considered;
in making the calculation for a stair connecting deck N to deck N+1
(or deck N-1), the persons to be considered are those entering the
stairs at deck N plus those coming from all decks below (or above)
deck N.
Note
3 At deck 7, 8 persons initially move from the
cabins into corridor 8 and 84 persons arrive to corridor 8 from deck
6, stair A; the total is therefore 92 persons.
Note
4 At deck 7, 18 persons initially move from
the cabins into corridor 7, 23 persons arrive to corridor 7 from deck
6 stair B and 84 persons arrive to corridor 8 from deck 7, corridor
7; the total is therefore 125 persons.
Note
5 At deck 7, 8 persons initially move from the
cabins directly to the stair C and 125 persons arrive to stair C from
corridor 8; the total is therefore 133 persons.
Note
6 At deck 8 (assembly/muster station), no persons
are initially present, therefore the escape routes on this deck are
then used by the total number of persons arriving from above and/or
below.
4.2 Case 2 refers to a day scenario in MVZ 2,
according to chapter 13 of the FSS Code, the 1,138 persons are initially
distributed as follows: 469 in deck 6; 469 in deck 7; and 200 in deck
9. Deck 8 (assembly/muster station) is initially empty. In accordance
with paragraph 2.2 of appendix 1 to the Guidelines, all persons are
assumed to simultaneously begin the evacuation and use the exit doors
at their maximum specific flow. The corresponding initial conditions
are:
MVZ 2 - Doors
|
Persons
|
Initial density D (p/m2)
|
Initial Specific flow Fs (p/(ms))
|
Calculated flow FC (p/s)
|
Initial speed of persons S (m/s)
|
Deck 6 door A
|
100
|
N.A.
|
1.3
|
1.3
|
N.A.
|
Deck 6 door B
|
100 .
|
N.A.
|
1.3
|
1.3
|
N.A
|
Deck 6 door C PS
|
134
|
N.A.
|
1.3
|
1.76
|
N.A.
|
Deck 6 door C SB
|
135
|
N.A.
|
1.3
|
1.76
|
N.A.
|
Deck 7 door A
|
170
|
N.A.
|
1.3
|
2.21
|
N.A.
|
Deck 7 door B
|
170
|
N.A.
|
1.3
|
2.21
|
N.A.
|
Deck 7 door C PS
|
65
|
N.A.
|
1.3
|
1.17
|
N.A.
|
Deck 7 door C SB
|
64
|
N.A.
|
1.3
|
1.17
|
N.A.
|
Deck 9 door C SB
|
100
|
N.A.
|
1.3
|
1.3
|
N.A.
|
Deck 9 door C PS
|
100
|
N.A.
|
1.3
|
1.3
|
N.A.
|
MVZ 1 Stairs, doors & corridors
|
Persons (N)
|
Total including those from other routes
|
Specific flow Fs in (p/(ms))
|
Max specific flow Fs (p/(ms))
|
Specific flow Fs (p/(ms))
|
Calculated flow Fc (p/s)
|
Speed of persons S (m/s)
|
Queue
|
Comments
|
From current route
|
Notes
|
Deck 6
stair A
|
100
|
100
|
0.93
|
0.88
|
0.88
|
1.23
|
0.44
|
Yes
|
up to
deck 7
|
1
|
Deck 6
stair B
|
100
|
100
|
0.93
|
0.88
|
0.88
|
1.23
|
0.44
|
Yes
|
up to
deck 7
|
1
|
Deck 6
stair C
|
269
|
269
|
1.1
|
0.88
|
0.88
|
2.82
|
0.44
|
Yes
|
up to
deck 7
|
1
|
Deck 7
stair A
|
170
|
270
|
1.68
|
0.88
|
0.88
|
1.8
|
0.44
|
Yes
|
up to
deck 8
|
1,
2
|
Deck 7
stair B
|
170
|
270
|
1.68
|
0.88
|
0.88
|
1.8
|
0.44
|
Yes
|
up to
deck 8
|
1,
2
|
Deck 7
stair C
|
129
|
398
|
1.61
|
0.88
|
0.88
|
2.82
|
0.44
|
Yes
|
up to
deck 8
|
1,
2
|
Deck 9
stair C
|
200
|
200
|
0.81
|
1.1
|
0.81
|
2.60
|
0.78
|
|
down to
deck 8
|
|
Deck 8
path 1
|
0
|
266
|
1.2
|
1.3
|
1.2
|
2.41
|
0.75
|
|
from
decks 7 and 9
|
1, 3
|
Deck 8
path 2
|
0
|
332
|
1.2
|
1.3
|
1.2
|
3.01
|
0.75
|
|
from
decks 7 and 9
|
1,
3
|
Deck 8
door A
|
0
|
270
|
0.88
|
1.3
|
0.88
|
1.8
|
N.A.
|
|
from
deck 7
|
1,
3
|
Deck 8
door B
|
0
|
270
|
0.88
|
1.3
|
0.88
|
1.8
|
N.A.
|
|
from
deck 7
|
1,
3
|
Note
1 The specific flow Fs in is the
specific flow entering the element of the escape route; the maximum
specific flow is the maximum allowable flow given in table 1.3 of
appendix 1 of the Guidelines; the specific flow is the one applicable
for the calculations i.e., the minimum between Fs in
and the maximum allowable; when Fs in is greater than
the maximum allowable, a queue is formed.
Note
2 Some stairs are used by both persons coming
from below (or above) and persons coming from the current deck considered;
in making the calculation for a stair connecting deck N to deck N+1
(or deck N-1), the persons to be considered are those entering the
stairs at deck N plus those coming from all decks below (or above)
deck N.
Note
3 At deck 8 (assembly/muster station), no persons
are initially present, therefore the escape routes on this deck are
then used by the total number of persons arriving from above and/or
below.
|
Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
exclusively on the terms and conditions set out in that contract.
|
 |
|