Paragraph 4
Where the total installed electrical power of the main generating
sets is in excess of 3 MW, the main busbars shall be subdivided into
at least two parts which shall normally be connected by removable
links or other approved means; so far as is practicable, the connection
of generating sets and other duplicated equipment shall be equally
divided between the parts.